| Sign In | Join Free | My infospaceinc.com |
|
Design Software : PKPM, Tekla structures, CAD
Design Load : Wind, Snow, Seismic
File Formats : Dwg and Pdf
Seismicresistance : Good
Length : Customizable, unlimited
Working Scope : Design,Fabrication, Installation
Structural Form : Grid Steel Structure
Shipment By : Container
Cost : Moderate to High
Purlins : Galvanized C and Z section steel
Material Grade : Q355B, Q235B
Window : Aluminum Alloy/Plastic Steel
Constructionspeed : Fast
Labor Costs : Lower
Sand Blasting : Sa 2.5
Certification : CE,ISO
Durability : High
Size : Customized
Product : Steel Structure
Maintenance Costs : Reduced
Insulation : EPS, Glasswool, Rockwool, PU On Option
Wall Color : White, Blue, Optional Colors
Application : General shopping mall
Wallmaterial : Steel Panels/Insulated Panels
Manure Removal System : Horizontal and oblique manure removal
Sustainability : Recyclable
Price : $99-99,999
Buildinglength : Customizable
Place Of Production : China
Place of Origin : Chengdu , China
Brand Name : Shunyao Supply Chain
Packaging Details : Bundles
Delivery Time : 5-8 WEEKS
Supply Ability : 15000TONS
MOQ : 100 PCS
Payment Terms : T/T in advance,L/C,D/P,T/T,D/A
Designflexibility : High
Loadcapacity : High
| Technical Parameter | Estimated Specifications (Typical 4,000 ㎡ Project) |
|---|---|
| Dimensions (L * W * H) | 80m (Length) * 50m (Width) * 8m (Eave Height) |
| Total Floor Area | 4,000 Square Meters (SQM) |
| Structure Type | Pre-Engineered Building (PEB) / Portal Frame System |
| Clear Span Design | Double Span (25m + 25m) with middle columns for cost-efficiency |
| Column/Bay Spacing | 8 meters (Total 10 bays) |
| Primary Steel Frame | Welded H-Section Columns & Beams (Steel Grade: Q355B / ASTM A572 Gr.50) |
| Secondary Structure | C/Z Section Purlins, Tie Rods, Knee Bracing (Steel Grade: Q235B) |
| Roof & Wall Cladding | 50mm Rockwool Sandwich Panels (Excellent fireproofing & insulation) |
| Design Load Standards | Wind Load: 0.50 kN/㎡ (Up to 150 km/h) | Earthquake Resistance: Grade 8 |
| Surface Treatment | Ball blasting (Sa2.5) + 2x Anti-rust Primer + 2x Finish Paint (Total DFT: 100μm) |
| Building Area | Span Type | Est. Total Steel Weight | Est. 40'HQ Containers Required | Est. Installation Time |
|---|---|---|---|---|
| 1,000 ㎡ | Clear Span (No middle columns) | 35 - 40 Tons | 2 - 3 Containers | 15 - 20 Days |
| 2,500 ㎡ | Clear Span (No middle columns) | 85 - 95 Tons | 4 - 5 Containers | 25 - 30 Days |
| 4,000 ㎡ | Double Span (With middle columns) | 140 - 150 Tons | 7 - 8 Containers | 40 - 45 Days |
| 10,000 ㎡ | Multi-Span (With middle columns) | 320 - 350 Tons | 15 - 18 Containers | 80 - 90 Days |
We provide detailed 3D installation drawings and step-by-step manuals with every delivery. The standard erection sequence includes:
|
|
Customizable Length High Load Capacity Fast Construction Speed Pre-Engineered Building & Steel Structure Building Images |